Projects

photo of engineering projects

Clients choose Geosyntec based on our record of providing advice, recommendations, and solutions of exceptional value. From highly scientific studies to large construction projects, our staff has extensive experience, the latest tools and technologies, and dedication to client service.

Filter Projects by Keyword or Practice

Representative Projects

Omya, Inc., of Florence, Vermont is the world's largest producer of high quality ground calcium carbonate (GCC) from marble bedrock, which is extracted from off-site…
Geosyntec provided design support for the Academy Museum of Motion Pictures, the nation's first large-scale museum dedicated entirely to the art, science, craft, business, and…
Project Objective Launch Complex 39B (LC39B) is a NASA launch site located at the Kennedy Space Center in Florida. LC39B was constructed in the mid-1960s…
Geosyntec was the design-build Contractor for two projects involving the remediation and disposal of low-level Naturally Occurring Radioactive Material (NORM) wastes at two sites in…
Geosyntec Consultants provided a time-critical geotechnical analysis to support Theoretical Pictures Film Company at a special effects location shoot for the Academy Award-winning film Dunkirk.…
Geosyntec developed and implemented an information management system (IMS) and an Instrumentation Data Acquisition System (IDAS), collectively known as the BooneDamIMS. The system brings together…
Geosyntec developed tools to compiled and visualize grouting and D-Wall panel data from the left bank grout curtain and slurry wall construction. In addition to…
Geosyntec developed an instrumentation and data management system to track, analyze, and visualize the ongoing lock removal. The system uses GIS technology to manage data…
Geosyntec built a system to import data collected during grouting operations and automatically generate progress drawings, resulting in significant time and cost savings for the…
Geosyntec developed and deployed a web-based application to track, analyse, and visualize data collected during grouting operations. This application syncs to on-site grout monitoring equipment…
Geosyntec acted as the Data Manager of Record for this barrier wall installation. Work included maintaining a geospatial database to compile all project data. Modules…
Geosyntec built an interactive geospatial model from tabular, LiDAR, MicroStation and other data sources. This model allows USACE to design additional remediation technologies, test the…
Geosyntec developed the USACE Innovation Award-Winning Wolf Creek Information Management System (WCIMS) to compile and manage data from this large and high-profile construction project.The Wolf…
Geosyntec developed the GroutTracker system to analyse and visualize grouting data collected during this grout curtain installation.The new 110' x 600' Chickamauga Lock is being…
Geosyntec acted as the Data Manager of Record for this barrier wall installation. We developed GIS tools to sync with equipment built by the Conractor…
Geosyntec developed the WallTracker system to allow USACE and the Contractor immediate and interactive access to field and laboratory data collected during a large-scale diaphragm-wall…
Geosyntec Consultants was retained by affiliates of Lennar Corporation and FivePoint (collectively referred to as the "Master Developer") to conduct environmental due diligence and assist…
An ephemeral drainage channel in La Jolla, California became severely incised due to stormwater and non-stormwater runoff from urban development that has increased over the…
The Høfde 42 pesticide waste disposal site is recognized as the most toxic contaminated site in Denmark. Between 1953 and 1962, the agrichemical manufacturing company…
Groundwater in Denmark that has been contaminated with chlorinated solvents is often remediated using in situ chemical oxidation (ISCO) with permanganate, or bioremediation via in…
Historical use of chromated copper arsenate (CCA) for treatment of building lumber has resulted in legacy arsenic and chromium contamination at dozens of wood treatment…
The first full-scale application of Savron’s STAR technology is underway. The 26-acre former coal tar site is located in Newark’s Ironbound district and is part…
In 1993, as a result of corporate safety, health and environmental policies, the client initiated a review to assess potential hazards to human health and…
Optimizing and completing post-closure care (PCC), or aftercare, of closed MSW landfills in Europe is a major issue facing SITA, the waste services arm of…
Groundwater supplies beneath the Kærgård Plantage pharmaceutical waste disposal site in Denmark are contaminated with substantial quantities of chlorinated solvents [primarily tetrachloroethene (PCE)], which are…
Geosyntec Consultants (Geosyntec) Ireland office (formerly Ford Consulting Group) has been retained by this client who has been required under IPPC to address contaminated soil…
The Høfde 42 pesticide waste disposal site is recognized as the most toxic contaminated site in Denmark. Between 1953 and 1962, the agrichemical manufacturing company…
Until recently, biological in situ enhanced reductive dechlorination (ERD) was not a proven or validated technology in Denmark. Chlorinated solvents in groundwater are recognized as…
The application of enhanced in situ bioremediation for the treatment of chlorinated solvent source areas, referred to as dense non-aqueous phase liquid (DNAPL), offers major…
A significant portion of the near-surface geology in Denmark is comprised of glacial moraine deposits, much of which consists of clayey till. Consequently, subsurface releases…
There are over 11,800 sites in Denmark where groundwater supplies are known to be contaminated, an estimated 1400 of which are contaminated with chlorinated solvents.…
The Naverland 26 site in Albertslund, Denmark was operated as a large-scale dry cleaner from 1965 to 1983. During this period, an estimated 5,000 tons…
Microscale zero valent iron (mZVI) and nanoscale ZVI (nZVI) are often effective amendments for remediation of chlorinated solvents in aquifers, but success with mZVI and…
Results of an enhanced in situ reductive dechlorination (ERD) pilot test performed at the site by another consultant in 2006 indicated that ERD will be…
Geosyntec was retained to review treatment alternative for brominated pesticide compounds found to exist in soil and groundwater beneath a former manufacturing facility in France.…
Geosyntec was retained to provide technical support on the design and implementation of an enhanced in situ bioremediation (EISB) biobarrier for the treatment of chlorinated…
This site was originally developed in the mid-1800s for the production of linseed oil. In the 1900s, manufacturing operations included leather tanning and the production…
Like other industrialized nations, groundwater supplies beneath many industrial sites in Sweden are contaminated with chlorinated solvents. Compared to countries in North America and other…
Groundwater supplies at many locations throughout Denmark have been impacted by chlorinated solvents including tetrachloroethene (PCE), trichloroethene (TCE), and 1,1,1-trichloroethane (1,1,1-TCA). Much of the contamination…

Lead Consultants

Geosyntec Consultants
Geosyntec is a specialized consulting and engineering firm that works with private and public sector clients to address new ventures and complex problems involving our environment, natural resources, and civil infrastructure.

Follow Us