Re-Suspension of Aeration Lanes for a Sewage Treatment Works in England

Severn Trent Water commissioned Geosyntec to investigate the optimal configuration of the Aqua Turbo aerators at the Melton Mowbray Sewage Treatment Works. These units aerated the mixed liquors using a screw impeller that drew up and impinged the fluid onto a flat plate above the water surface, creating a spray.

Geosyntec Scope of Services:

Attached to each unit was a draft tube that protruded into the aeration lane with the aim of inducing re-suspension and promoting the mixing of the sludge. Although the mixing energy density applied to the system should have been sufficient to hold the mixed liquors in constant suspension, the experimental evidence suggested that substantive regions of the tank remained un-mixed. Therefore, Geosyntec investigated three draft tubes of different lengths to determine which was the most effective at transferring the mixing energy into the solids suspension. A transient computational fluid dynamic (CFD) process model of the Aqua Turbo aerators was developed and the sludge phase was modelled using drift flux theory with the slip velocity, or hindered settling, modelled according to Tákacs [1]. Given the sitrred setteled volume index (SSVI) of the activated sludge, the free settling velocity and free settling parameter in the Tákacs model were obtained from the Pitman [2] and White [3] correlations. The rheology of the fluidsolids mixture was modelled according to Bokil and Bewtra [4].

Notable Accomplishments:

It was found that the most effective draft tube for suspending the settled bed and maintaining the solids in suspension was the longest one. It was also observed that the longest draft tube was able to suspend a settled bed faster than the other draft tubes investigated, showing the longest cone at the onset of re-suspension. Geosyntec enabled Severn Trent Water to assess the adequacy of draft tube designs prior to construction. In this case, the client used the CFD results to justify the modification of the plant with the longer draft tube. Our reccomendations prevented a cost over-run associated with installing a shorter draft tube was prevented.

References:
1. Tákacs, I., Patry, G.G., Nolasco, D., 1991, A Dynamic model of the clarification-thickening process, Water Res., 25(10), pp. 1263-1271
2. Pitman, A.R., 1980, Settling Properties of Extended Aeration Sludge, J. Wat. Pollut. Control Fed. 52(3), 524-536
3. White, M.J.D., 1975, Settling of Activated Sludge, Technical Report TR11, Water Research Centre, Stevenage, UK
4. Bokil, S.D., Bewtra, J.K., 1972, Influence of mechanical blending on aerobic digestion of waste activated sludge, Proc. 6th Int. Assoc. on Water Pollution Research and Control, London, pp. 421-438

Project Overview

  • Location: England
  • Client: Melton Mowbray Sewage Treatment Works
  • Project Practice Areas: Water and Wastewater System Planning, Engineering, and Design, Waste Management Planning, Engineering, and Design
  • Type of Facility: Wastewater Treatment
  • Type of Work: Planning and Assessment
  • Company: MMI Engineering
Geosyntec Consultants
Geosyntec is a specialized consulting and engineering firm that works with private and public sector clients to address new ventures and complex problems involving our environment, natural resources, and civil infrastructure.